Re-use by Stuttgart 21: New ideas for the old Neckar railway bridge – Stuttgart 21

0
0


This is what the old Rosenstein Bridge over the Neckar (in the foreground, behind the new railway bridge) could look like according to the idea of ​​Schlaich Bergermann Partner. © www.de24.news The  arch bridge would be greened.

Foto: schlaich bergermann partner/LAVA

© www.de24.news

 The  new Stuttgart 21 rail infrastructure is scheduled to go into operation at the end of 2025. This frees the old Rosenstein Bridge over the Neckar. It could find a new use.

Stuttgart – © www.de24.news

 The  state capital is considering the purchase of the old four-track railway bridge over the Neckar between Rosensteinpark and Bad Cannstatt. After the commissioning of the Stuttgart 21 project, it will no longer be needed for the railroad, because the railroad has built a new steel bridge downstream. This ensures the connection to the new tunnels under the park and to the underground station.





[ source link ]
https://www.stuttgarter-zeitung.de/inhalt.nachnutzung-durch-stuttgart-21-neue-ideen-fuer-alte-neckar-bahnbruecke.b1b6c2bc-7e88-4255-9aa1-fb34f1a793b7.html?reduced=true

Reuse Stuttgart ideas Neckar railway bridge Stuttgart

LEAVE A REPLY

Please enter your comment!
Please enter your name here